C Street/I-110 Access Ramp Improvements
CLIENT
The Port of Los Angeles 425 S Palos Verdes St San Pedro, CA 90731 Sue Lai, PE Project Manager Engineering Division (310) 732-3649
SERVICES PROVIDED
Construction Support, Coordination with Design Consultant, Meetings, Site Visits, and Observations, Clarifications and Requests for Information (RFI), Shop Drawings and Submittals, Claim Review, Construction Document Revisions, Deliverables
The Port of Los Angeles (POLA), in conjunction with the California Department of Transportation (Caltrans) District 7, is implementing the C Street/ (northbound) Interstate 110 Access Ramp Improvement project to increase traffic circulation, reduce congestion, and improve operation and safety. The new configuration combines two intersections into one new intersection that will connect Figueroa Street, Harry Bridges Boulevard, John S. Gibson Boulevard, and the 1-110 On-Ramps and southbound Off-Ramps and includes widening a Union Oil undercrossing.
DRC is partnering with POLA’s Engineering Division to provide engineering support during the construction phase. DRC’s support involves mentoring the engineering staff while working with the Project Manager; coordinating, directing, and obtaining information from the Design Consultant to fulfill the scope of services; attending construction meetings and preparing minutes; interpreting and clarifying contract documents for engineers and the contractor; reviewing shop drawings and noting deficiencies with the design concept; reviewing inspection certificates, mill test reports, non-routine lab reports, and other tests required by law and conducting a final inspection to determine if work is acceptable; revising construction documents or supplementary contract documents as necessary to correct errors or omissions or address other occurrences during construction; and preparing deliverables for all of these activities.